FAQ’s

Kitty Hawk Wind

Did you know?

Kitty Hawk Wind is a 122,405-acre offshore wind project more than 24 nm from the Outer Banks. The Wind Energy Area was awarded to Avangrid Renewables in 2017 and is projected to be able to support 3,500 MW of electricity generation which would be enough to power approximately 1 million homes.
Learn More

Carolina Long Bay

Did you know?

Carolina Long Bay is a wind energy area composed of two lease areas totaling 110,091 acres approximately 22 miles off the coast of Bald Head Island, NC. The two lease areas have the potential for combined production up to 3 gigawatts (GW) of power, which is equivalent to the electric consumption of approximately 675,000 households. Duke Energy Renewables and TotalEnergies Renewables are the developers for these projects.
Learn More

With current technology, offshore wind turbines can range from 12 MW to 14 MW. GE Renewable Energy is developing a 14 MW turbine with a 220-meter rotor, 107-meter blade, and 260 meters high.

A wind turbine functions like a very slow-motion fan, but in reverse. Instead of applying electricity to turn the blades and produce wind, a turbine uses wind to turn the blades, which are connected to a generator in the nacelle.The generator converts the mechanical rotation into electrical energy, which is then fed into the grid.

Depending on the wind speed, offshore turbine blades will turn one revolution about every 4 to 8 seconds, or a rate of about 8 to 16 RPM.

The Bureau of Ocean Energy Management is an office within the U.S. Department of Interior and manages the responsible offshore renewable energy development in Federal waters of the United States. 

The State of North Carolina’ Department of Environmental Quality (DEQ) works with federal agency partners (i.e. BOEM) to responsibly identify offshore wind opportunities for North Carolina’s outer continental shelf. Coastal wind energy-related activities occurring within three nautical miles of shore are subject to North Carolina’s jurisdiction.

Through a competitive leasing process, BOEM awarded Avangrid Renewables the Kitty Hawk Wind Energy Area in 2017. A utility has not yet committed to purchasing the energy from the Kitty Hawk project.

On May 11, 2022, BOEM announced that Duke Energy Renewables and TotalEnergies Renewables will develop the Wilmington East Wind Energy Area, which includes two lease areas. 

The Energy Policy Act of 2005 (EPAct) authorized BOEM to issue leases, easements and rights of way to allow for renewable energy development on the Outer Continental Shelf (OCS). 

BOEM’s renewable energy program occurs in four distinct phases: planning, leasing, site assessment, and construction and operations. BOEM engages key stakeholders throughout this process, as early communication with interested and potentially affected parties is critical to managing potential conflicts.

The Wilmington East Wind Energy Area and the Kitty Hawk Wind Energy Area were both chosen as commercial wind energy areas due to the minimal impact on critically endangered and migratory species. Research shows that offshore wind development presents a low risk to marine mammals, including whales. Best management practices to reduce ship strikes, noise pollution, and species specific impacts during construction, O&M, and decommissioning of wind energy areas are part of a dynamic research and monitoring process.  

According to BOEM’s draft Environmental Assessment for the Wilmington East WEA, “Lease blocks overlapping the North Atlantic right whale (NARW) critical habitat…were removed from leasing consideration.”  

The Wilmington East and Kitty Hawk Wind Energy Areas have very minimal overlap with bird use areas.

In order to mitigate impacts to migratory and endangered species, new technology has been leveraged to geolocate migratory birds and pause the use of turbines in the most active seasons in order to allow for birds to complete migratory paths. This is a very common technology used for onshore wind projects and they are becoming more and more automated.

When turbines are taken out of service, they are process through one of three ways—repurposing, recycling, or disposal. This largely depends on the materials the component is made of but can also be affected by local and state regulations, market demand, costs, and the availability of recycling infrastructure.

Between 85%-95% of wind turbine components are able to be recycled, with the composite blades being the hardest component to recycle. Offshore wind developers, turbine component manufacturers, and the federal government are contributing to research to eliminate waste and create a “circular economy” for the industry.

In the U.S., much progress is being made in the recycling of blades at scale in order to process a sudden influx of old blades that were replaced by newer models or during decommissioning. 

Projects will be decommissioned and wind turbines will be responsibly removed once an installed project reaches the end of its useful life. The permits required to build offshore wind projects establish a plan and funding mechanism for decommissioning. 

A typical wind turbine will repay its carbon footprint in less than six months , and it will generate emission-free electricity for the remainder of its 20 to 30-year lifespan.

Both onshore and offshore turbines have built-in mechanisms to lock or feather the blades (reduce the surface area that is pointing into the wind) when wind speeds are excessive. These mechanisms have proven successful in the U.S.’s first offshore wind farm in Block Island, RI.

The US Coast Guard has publicly stated that they have no intention of limiting navigational and fishing access to the foundations of turbines in State or Federal waters. 

BOEM provides several public comment periods for the public to provide input during the regulatory process. So far, offshore wind has received positive feedback from fishermen in the North East because turbines create artificial reef structures that enhance biodiversity of fish and filter feeders, enhancing the recreational and commercial fishing industries. 

A seven-year-long study, the first of its kind in the United States, titled, “Demersal fish and invertebrate catches relative to construction and operation of North America’s first offshore wind farm,” was published in the ICES Journal of Marine Science on March 29, 2022. The researchers found that there was no significant negative effect on fish that live near the bottom of the sea – demersal fish – and invertebrate populations during Block Island’s construction and operation.

11 states along the east coast (Maine, New Hampshire, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Delaware, Maryland, Virginia, and North Carolina) have joined the Fisheries Mitigation Project. This project serves as a common framework across east coast states to anticipate and avoid impacts on fisheries and provide financial compensation for any acquired economic impact related to offshore wind development.

According to the National Renewable Energy Laboratory’s Annual Technology Baseline, a commonly-used tool in the power generation sector to forecast electricity prices across technologies, the cost of offshore wind is anticipated to be competitive with gas generation by 2030 – the year by which North Carolina has committed to generating 2.8-gigawatts of offshore wind through Governor Cooper’s Executive Order 218.

All wind turbines operate in the same basic manner. As the wind blows, it flows over the airfoil-shaped blades of wind turbines, causing the turbine blades to spin. The blades are connected to a drive shaft that turns an electric generator to produce electricity. The newest wind turbines are technologically advanced and include engineering and mechanical innovations to help maximize efficiency and increase the production of electricity. For more information about wind turbine technology, see NREL’s “Wind Energy Basics: How Wind Turbines Work“.

The power for the Kitty Hawk and Wilmington East Wind Energy Areas have not been designated for any specific state or utility.

The military has a well-established and rigorous process for ensuring that wind development occurs in a manner that is compatible with military operations. The Department of Defense (DoD) Siting Clearinghouse examines and analyzes each proposed wind farm, and includes participation from all five military branches.

Federal law allows DoD to raise concerns if a proposed energy project, individually or on a cumulative basis, may adversely impact military readiness or operations.

Researchers who analyzed AirBnB rental data before and after construction of the Block Island Wind Farm have found that, contrary to some concerns, the turbines have been linked with increased tourism on the island.

“During July and August following construction of the turbines, AirBnB rentals in Block Island experienced, on average, a 19 percent increase in occupancy rates and a $3490 increase in monthly revenue compared to those in Narragansett, Westerly and Nantucket.” Learn more here. 

What will turbines look like from shore?

View the Wilmington East Wind Energy Area from Brunswick County beaches.